LOCALLY PRODUCED ELECTRICITY IN BRIKSDAL
BRIKSDAL MINIKRAFT
Briksdal Minikraft began operating in 2017 with one turbine. In 2012, we were granted a licence to expand production with an additional turbine, which began operating in 2017. This is how we have sustained ourselves with green, locally-produced electricity for many years.
TURBINE 1
Owner: Briksdalsbre Fjellstove AS
Operating since: 24 May 2007
Pipeline length: 590 m
Fall: 62 m
Turbine: Francis
Annual production: 1.4 GWh
Maximum power output: 250 kW
TURBINE 2
Supplier: Energi Teknikk AS, Rosendal
Operating since: 18 May 2017
Annual production: 1.1 GWh
Maximum power output: 260 kW
Turbine: Francis
TOTAL PRODUCTION – BOTH TURBINES
Turbine 1: 1.4 GWh
Turbine 2: 1.1 GWh
Total both turbines: 2.5 GWh
SUPPLIERS
Planning/construction management: Nordplan AS, Stryn
Generator/turbine, total package: Energi Teknikk AS, Rosendal
Excavation/pipe laying: Yri Sand AS, Loen
Pipes/hatches: Brødrene Dahl AS
Concrete work: Kåre Bøe, Stryn
Concrete delivery: Stryn Betong AS, Loen
Electrical work: Øvreberg Installasjon AS, Stryn
The power plant’s intake is situated about 250 metres behind Fjellstova mountain lodge, towards the glacier. The terminal station is about 240 metres down from the lodge, below the lower car park. We operate at full capacity in the summer months, with somewhat lower production in winter.
Charging Station
Charge your car in Briksdal
Sustainability
There is no planet B
The National Park
The biggest glacier in mainland Europe
Briksdal Glacier
Invigorating and incredibly beautiful
History
The first tourists